IMPORTANT NOTICE

WOOLASTOOK DRIVE AND INGLEWOOD DRIVE

PROPERTY OWNERS


The Town will be undertaking construction activity from June to mid August of this year on the road Right-Of-Ways for Woolastook Drive and Inglewood Drive. Generally, the extent of the work includes the following:

- Completion of widening and restoration work along the entire length of Inglewood Drive

- Completion of curb and gutter at various locations along the entire length of Woolastook Drive

- Resurfacing work for both Inglewood Drive and Woolastook Drive will start the week of June 6, 2011. The placement of new asphalt will begin at the south end of Inglewood Drive and proceed to the north end. This will be followed by resurfacing on Woolastook Drive which will proceed from the south end northward in a similar manner.

In order to facilitate construction and minimize delays, all items will need to be removed from the Right-Of-Ways by property owners. Shrubs and mail boxes as examples, will need to be removed as well as any other objects installed by residents. We encourage residents to remove items as soon as possible and we ask for your patience and co-operation during construction. Although construction will involve inconvenience for residents, every effort will be made to minimize the inconvenience and disruption.

Residents are asked to be particularly cautious for the duration of this extensive street work since temporary obstructions such as raised manhole covers and uneven pavement surfaces may be encountered at various locations.

If you have any questions please contact Bruce Gault, P.Eng., Works Commissioner at 738-6422 or by email at bgault@towngbw.ca .